Home

History

Design

Roster

Updates

Website updated
2015 Jan 18th

 About tnsf.ca   News   Hosted Pages   Canadiana Links

TNSF.CA > Updates > Powering the railyard

Powering the railyard
2015 January 4th

Now that I have my locomotive and DCC system I can test the track I've been installing. I started with the railyard, which includes ten turnouts, as well as some surrounding track.


Holes were drilled, power feeder wires were inserted and soldered to the track


Power feeders are connected to the main power bus under the table


Suitcase connectors provide an easy way to attach a feeder wire to the bus without the need for soldering


The railyard is now fully powered and functional

Copyright ©2011-2017, True North, Strong and Free, http://tnsf.ca