Home

History

Design

Roster

Updates

Website updated
2015 Jan 18th

 About tnsf.ca   News   Hosted Pages   Canadiana Links

TNSF.CA > Updates > Laying Track

Laying Track
2013 September 1st

A railroad layout really begins to take shape once the track is down. There is now track installed around the back of the table—around 360 scale metres.


Track laying began in the back corner


Bridge can be removed for plastering


The trestle on the main line


Track is in place along the back of the layout

Copyright ©2011-2017, True North, Strong and Free, http://tnsf.ca